Ring out, solstice bells!

And so we turn again to our perusal of the bounty that is the December issue of Perspectives and that most splendid of pursuits, the Clarifications and Expectations column. With the pending changes to the Life Safety (LS) chapter, it appears that we are in for a sequential review of said chapter, starting at the beginning (the process/program for managing LS compliance within your organization) and (at least for now) moving to a deep dive into the ILSM process in January—so stay tuned!

So let’s talk a little bit about the requirements relative to how the physical environment is designed and managed in such a manner as to comply with the Life Safety Code® (LSC). Previously, there were but four performance elements here: assigning someone to manage the process (assessing compliance, completing the eSOC, managing the resolution of deficiencies); maintaining a current eSOC; meeting the completion time frames for PFIs (did you ever think we would get to a point where we could miss those three letters?); and, for deemed status hospitals, maintaining documentation of AHJ inspections. For good or ill (time, as always, will be the final judge), the number of performance elements has grown to six with a slight modification to some of the elements due to the shift away from the eSOC as one of the key LS compliance documents and the evolution (mutation?) of our friend the Plan for Improvement into the Survey-Related PFI. With greater numbers of performance elements, I guess there will be a subsequent increase in confusion, etc. regarding interpretations (yours, mine, theirs) as to what it all means, which leaves us with requirements to:

 

  • Designate resources for assessing life safety compliance (evidence could be letters of assignment, position descriptions, documentation in meeting minutes); the survey process will include an evaluation of the effectiveness of the chosen method(s) for assessing LS compliance

 

  • Performance of a formal LS compliance assessment of your facility—based on time frames determined by your organization (big freaking hint: “best practice” would be at least annually); you can modify/adjust time frames based on the stability of your physical environment (if there’s not a lot going on, you might be able to reduce frequencies, though I haven’t been to too many places that didn’t have some activities that would impact LS compliance (Can you say “network cabling”? Sure you can!). Also, there is mention of the use of certain performance elements sprinkled throughout the LS chapter that will be used for any findings that are not specifically covered by the established performance elements. Clearly, there is a desire to leave no stone unturned and no deficiency unrecorded. Yippee!

 

  • Maintaining current and accurate life safety drawings; we’ve covered this in the past (going back to 2012), but there are still some folks getting tagged for having incomplete, inaccurate or otherwise less-than, life safety drawings. Strictly speaking, the LS drawings are the cornerstone of your entire LS compliance efforts; if they need updating and you have a survey any time in the next 12-18 months, you better start the leveraging process for getting them reviewed/revised. They don’t tell you how to do it, but if they’re not on auto-cad at this point, you better have a wizard for whatever program you are using. All they need to do is find one inconsistency and they can cite it…ugh! Check out the list in Perspectives and make sure that you can account for all of it.

 

  • Process for resolving deficiencies identified during the survey; we know we have 60 days to fix stuff found during the survey (and hopefully they don’t find anything that will take longer than that to resolve—I have this feeling that that process is going to be exceptionally unwieldy—and probably unyielding to boot). The performance element covers the process for requesting a time-limited waiver—that’s got to happen within 30 days of the end of the survey. Also, the process for requesting equivalencies lives here (if folks need a refresher on equivalencies, let me know and I will put that on the list for 2017 topics). Finally, this is also where the official invocation of the ILSM process as a function of the post-survey process is articulated (I think we covered that pretty thoroughly last week, but if you have questions—go for it!).

 

  • Maintaining documentation of any inspections and approvals (read: equivalencies) made by state or local AHJs; you’ve got to have this stuff organized and in a place you can lay your hands on it. Make sure you know how often your AHJs visit and make sure that you have some evidence of their “presence.” I think it also makes sense to keep any inspections from your property insurers handy—they are almost as powerful an AHJ as any in the process and you don’t want to run afoul of them—they can have a significant financial impact if something goes sideways with your building.

 

  • The last one is a little curious to me; I understand why they’re saying it from a global perspective, but it really makes me wonder what prompted specific mention. You can read the details of the language in Perspectives, but my interpretation of this is “don’t try any funny stuff when you’re renovating interior spaces and leave 4-foot corridor widths, etc., when you have clearly done more to the space than ‘updated finishes.’” I think this is the call-to-arms relative to having a good working knowledge of Chapter 43 of the 2012 You need to know what constitutes: repair; renovation; modification; reconstruction; change of use or occupancy classification; addition (as opposed to subtraction). Each of these activities can reach a degree/scope that “tips” the scales relative to the requirements of new versus existing and if you haven’t made that determination (sounds very much like another risk assessment, don’t it?) then you can leave it in the hands of a surveyor to apply the most draconian logic imaginable (I think draconian logic might be oxymoronic—and you can put the accent on either syllable), which will not bode well for survey success.

 

That’s the word from unity for this week; next week, we’ll check up on some Emergency Management doings in the wake of recent flooding, including some updates to the Joint Commission’s Emergency Management Portal (EMP?). Hope your solstice salutations are merry and bright until next time!

Entry Information

Filed Under: Emergency managementHospital safetyLife Safety CodeThe Joint Commission

Tags:

Steve MacArthur About the Author: Steve MacArthur is a safety consultant with The Greeley Company in Danvers, Mass. He brings more than 30 years of healthcare management and consulting experience to his work with hospitals, physician offices, and ambulatory care facilities across the country. He is the author of HCPro's Hospital Safety Director's Handbook and is contributing editor for Briefings on Hospital Safety. Contact Steve at stevemacsafetyspace@gmail.com.

RSSPost a Comment  |  Trackback URL

*