Oh, what fresh hell is this?

Much as 2016 has laid waste to the pantheon of pop culture, so has it decimated the status quo in the realm of facilities and safety management. While this year has brought “pleasures” expected (adoption of the 2012 edition of the Life Safety Code®) and unexpected (the demise of the Plan for Improvement process), it appears that the wheels (gears?) that drive this regulatory machine are not yet done churning out new stuff for us to ponder.

As you’ve probably heard by now, last week CMS finally dropped the mike on the federal requirements relating to emergency management and the healthcare world. (Press release can be found here; link to the final rule–the hospital requirements start on p. 584 of this oh so fabulous 651-page document. Monsieur Needle, please meet Monsieur Haystack…zut alors!)

Let’s do a quick run-through of the four primary components:

  • You have to have an emergency preparedness plan that must be reviewed and updated at least annually.
    • The plan must be based on, and include, a documented facility-based and community-based risk assessment, utilizing an all-hazards approach.
    • The plan must include strategies for addressing emergency events identified by the risk assessment, utilizing an all-hazards approach.
    • The plan must address patient population, including, but not limited to, persons at-risk; the type of services the hospital has ability to provide in an emergency; and continuity of operations, including delegations of authority and succession plans.
    • The plan must include a process for cooperation with the various AHJs’ efforts to maintain an integrated response during a disaster or emergency situation, including documentation of the hospital’s efforts to contact such officials, and when applicable, its participation in collaborative and cooperative planning efforts.
  • Develop emergency preparedness policies and procedures that must be reviewed and updated at least annually. The policies and procedures must address the following:
    • The provision of subsistence needs for staff and patients, whether they evacuate or shelter in place, include, but are not limited to the following:
      • Food, water, medical, and pharmaceutical supplies.
      • Alternate sources of energy to maintain the following:
        • Temperatures to protect patient health and safety and for the safe and sanitary storage of provisions.
        • Emergency lighting.
        • Fire detection, extinguishing, and alarm systems.
        • Sewage and waste disposal.
        • A system to track the location of on-duty staff and sheltered patients in the hospital’s care during an emergency. If on-duty staff and sheltered patients are relocated during the emergency, the hospital must document the specific name and location of the receiving facility or other location.
        • Safe evacuation from the hospital, which includes consideration of care and treatment needs of evacuees; staff responsibilities; transportation; identification of evacuation location(s); and primary and alternate means of communication with external sources of assistance.
        • A means to shelter in place for patients, staff, and volunteers who remain in the facility.
        • A system of medical documentation that preserves patient information, protects confidentiality of patient information, and secures and maintains the availability of records.
        • The use of volunteers in an emergency and other emergency staffing strategies, including the process and role for integration of State and Federally designated healthcare professionals to address surge needs during an emergency.
        • The development of arrangements with other hospitals and other providers to receive patients in the event of limitations or cessation of operations to maintain the continuity of services to hospital patients.
        • The role of the hospital under a waiver declared by the Secretary, in accordance with section 1135 of the Act, in the provision of care and treatment at an alternate care site identified by emergency management officials.
      • Develop and maintain an emergency preparedness communication plan that must be reviewed and updated at least annually, which includes names and contact information for the following:
        • Staff
        • Entities providing services under arrangement
        • Patients’ physicians
        • Other hospitals and CAHs
        • Volunteers
      • The communications plan must also include contact information for the following:
        • Federal, state, tribal, regional, and local emergency preparedness staff
        • Other sources of assistance
      • The communications plan must identify primary and alternate means for communicating with the following:
        • Hospital’s staff
        • Federal, state, tribal, regional, and local emergency management agencies
      • The communications plan must provide a method for sharing information and medical documentation for patients under the hospital’s care, as necessary, with other healthcare providers to maintain the continuity of care.
      • The communications plan must provide a means, in the event of an evacuation, to release patient information as permitted under 45 CFR 164.510(b)(1)(ii).
      • The communications plan must provide a means of providing information about the general condition and location of patients under the facility’s care as permitted under 45 CFR 164.510(b)(4).
      • The communications plan must provide a means of providing information about the hospital’s occupancy, needs, and its ability to provide assistance, to the authority having jurisdiction, the Incident Command Center, or designee.
    • Develop and maintain an emergency preparedness training and testing program that is reviewed and updated at least annually.
      • The training program must provide for:
        • Initial training in emergency preparedness policies and procedures to all new and existing staff, individuals providing services under arrangement, and volunteers, consistent with their expected role
        • Emergency preparedness training at least annually
        • Maintenance of documentation of the training
        • Demonstration of staff knowledge of emergency procedures
      • The testing program must provide for:
        • Participation in a full-scale exercise that is community-based or when a community-based exercise is not accessible, an individual, facility-based. If the hospital experiences an actual natural or man-made emergency that requires activation of the emergency plan, the hospital is exempt from engaging in a community-based or individual, facility-based full-scale exercise for one year following the onset of the actual event.
      • Conduction of an additional exercise that may include, but is not limited to the following:
        • A second full-scale exercise that is community-based or individual, facility-based
        • A tabletop exercise that includes a group discussion led by a facilitator, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan
      • Analysis of the hospital’s response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the hospital’s emergency plan, as needed.

To be honest, at first blush, I don’t see anything of particularly dire consequence (feel free to disagree; I’m always up for some civil—or uncivil—discourse) unless you’ve done a less-than-complete job of documenting your communications with the various and sundry AHJs (“The plan must include a process for cooperation with the various AHJs’ efforts to maintain an integrated response during a disaster or emergency situation, including documentation of the hospital’s efforts to contact such officials, and when applicable, its participation in collaborative and cooperative planning efforts.”). In fact, it will be interesting to see if TJC backs off of their caveat that tabletops don’t count towards the annual exercise requirement though, as you can see, the tabletop must include some very specific elements.

There is some additional language relating to provisions for stand-by and emergency power that includes providing for generator locations when you build new or renovate (who wants an emergency generator that could end up under water?); maintaining fuel sources during an emergency; testing components in accordance with requirements, etc., but, again, I’m not seeing a lot of indigestion-inciting language. I suppose it is possible that, at the end of all this (I mean, what’s left to tweak), there will be enough certainty in the regulatory fabric to promote a consistent application of the standards, etc. during surveys. Wouldn’t that be nice…

Entry Information

Filed Under: CMSEmergency management

Tags:

Steve MacArthur About the Author: Steve MacArthur is a safety consultant with The Greeley Company in Danvers, Mass. He brings more than 30 years of healthcare management and consulting experience to his work with hospitals, physician offices, and ambulatory care facilities across the country. He is the author of HCPro's Hospital Safety Director's Handbook and is contributing editor for Briefings on Hospital Safety. Contact Steve at stevemacsafetyspace@gmail.com.