This week in hell: What about the damn dampers?

We are certainly in the (very) early stages of the departure of The Joint Commission’s Plans for Improvement (PFI) process from our midst (Is it possible for a process to have abandonment issues? I suspect we’re going to be feeling something like it for quite some time to come.) and there continues to be much to chew on. This week, I’m going to break it down into a couple of chunks that will hopefully allow us to more easily digest this big mouthful of unpleasantness, but first, a rant (ooooh, big surprise):

 

  • I honestly don’t have a dog in this particular fight beyond my position as an observer of accreditation and regulatory compliance activities in healthcare, but I continue to “bump” up against the practice of TJC revealing substantive (and substantial) changes in forums that are not completely accessible to everyone with a dog in the fight. I don’t know about you, but my boss is generally inclined for me to be busy doing productive work, so I don’t oft (okay, never) get to the annual ASHE conference (and yes, I recognize the educational value, etc., of such gatherings, but, as you all probably know pretty well, that can be a very tough sell). Consequently, I (and perhaps a whole bunch of “yous” out there in the audience) was not present when the discontinuation of the PFI process was announced. I don’t know if there was a Q&A that followed the announcement, so I have no idea if questions were asked and answered, asked and deferred, asked and not answered, etc. I suspect if we all had known what was coming down the pike this year, between adoption of the 2012 Life Safety Code® (LSC) and PFI getting kicked to the curb, we might all have made a little bit of an extra effort to get to ASHE (well, perhaps you would have—I was having way too much fun tripping around Texas). At any rate, at the very least, I would love to see a transcript of the presentation as well as any Q’s and A’s that might have occurred. As an alternative thought, I also believe that something this monumentally important is deserving of a free webinar from TJC that includes a live Q&A (or if not a live Q&A, answers to pre-submitted questions would be okay)—this has the potential to be enormously painful for facilities and safety folks over the next little while (the optimist in me says “little while,” my fear is fairly long while) and, as customers, I think those same facilities and safety folks deserve a little time with the powers that be.
  • So what do we do with the damn dampers? As near as I can tell (with absolutely no empirical data beyond the number of questions I’ve received on the topic), there are a fair number of folks who have taken advantage of the PFI process for managing inaccessible dampers. When the PFI process goes away, does this mean all those dampers have to be brought in to compliance within the 60-day window? I am truly hoping that something specific to this issue is forthcoming before folks start tying up all the mechanical contractors in the US. Perhaps there’s a categorical waiver in the future for this piece of business—I think that would be a nice surprise. One thing I can tell you is that I know of at least one hospital that CMS required to clean up the damper issues identified on the PFI, so I have no reason to think that leniency will be the order of the day.
  • For those of you that reflect the PFI process in either your management plans or your ILSM plans/policies, you should probably pull those out and update the process as a function of no PFI process (I’m still not quite over the initial shock of that). Certainly for many, many years, a fundamental part of the standards-based requirements relative to ILSM was the management of LSC deficiencies that could not be immediately corrected (or corrected immediately, depending on your perspective), which brings us squarely into the realm of the PFI process. At any rate, make sure you make a quick of any policies/processes (hey, maybe even in your work order system) to make sure that you expunge all evidence of the PFI process.
  • As to the discontinuation of the Basic Building Information component of the Statement of Conditions, one of the things that’s “driven” by the information contained therein is the number of survey days, based on the square footage of healthcare occupancies in your facility. I don’t believe that the square footage question is asked during the organizational application process (might be worth checking with the individual in your organization charged with filing the application to verify what may or may not be in the mix), which makes me wonder how they will make the determination if folks don’t update the eBBI information. I suppose they have a basic starting point now, so it probably won’t change that much, but I also think of the SOC as a great means of communicating certain information to the surveyors—existing waivers/equivalencies (which makes me wonder: are we looking at a day when all the existing waivers/equivalencies granted by TJC go away or at least have to be resubmitted to CMS?), locations and square footage of suites, level of sprinkler coverage, and other unique aspects of the building can all be memorialized in the comment section of the SOC. But if the surveyors aren’t going to look at the SOC any more, do we print out the information and provide it to them directly or does this become one more potential sticking point during a survey? I guess a lot of the same information can be included on the life safety drawings, but I know a lot of folks don’t have the wherewithal to manage the drawings themselves so they use an architect or fire protection engineer for updates, etc.

 

All that said, I guess we’ll just have to keep our fingers crossed that some level of sanity is restored to the process, but given the state of the world, I don’t think I’m going to be holding my breath while I wait.

Entry Information

Filed Under: CMSLife Safety CodeThe Joint Commission

Tags:

Steve MacArthur About the Author: Steve MacArthur is a safety consultant with The Greeley Company in Danvers, Mass. He brings more than 30 years of healthcare management and consulting experience to his work with hospitals, physician offices, and ambulatory care facilities across the country. He is the author of HCPro's Hospital Safety Director's Handbook and is contributing editor for Briefings on Hospital Safety. Contact Steve at stevemacsafetyspace@gmail.com.

RSSComments: 1  |  Post a Comment  |  Trackback URL

  1. Am real curious about what will happen to those of us who have submitted equivalencies to JC, who approved them, forwarded them to CMS, and after almost 2 years there has been no word from CMS????

RSSPost a Comment  |  Trackback URL

*